    PROJECTS BY SERVICE PROJECTS BY MARKET

    CAFO Work

    Beginning in 2012, WET contracted with a law firm to provide investigative services and expert witness testimony for civil actions being brought against several large concentrated..

    Learn More >

    UAV Vegetation Survey for Utility Company

    WET completed an aerial vegetation survey for a utility company in southwestern Montana to determine post-construction vegetation re-growth. Under the requirements of Montana...

    Learn More >

    UAV Remote Sensing for Noxious Weeds

    WET completed an aerial vegetation survey for a private ranch owner in southwestern Montana to map noxious weed densities. WET used the eBee RTK UAV equipped...

    Learn More >

    Ore Stockpile UAV Survey

    WET completed an aerial topographic survey for an industrial facility to determine the volume of an ore stockpile. WET used the eBee RTK UAV to collect high-resolution aerial...

    Learn More >

    Lower Clark Fork Road Sediment Assessment

    The scope of this project was to conduct a sediment and culvert assessment of the unpaved road network within six watersheds of the Lower Clark Fork River TMDL Planning Area (TPA)..

    Learn More >

    Tobacco River Sediment and Habitat Assessment

    WET personnel conducted a sediment and habitat assessment in the Tobacco River TMDL planning areas for Montana DEQ. This assessment included the evaluation...

    Learn More >

    Rock Creek TMDL Sediment and Habitat Assessment

    WET personnel conducted a sediment and habitat assessment in the Rock Creek TMDL planning area for Montana DEQ. This assessment included the evaluation of stream...

    Learn More >

    Metals and Nutrient Water Quality Monitoring

    WET personnel collected water quality samples in the Upper and Lower Jefferson River TMDL Planning Area for Montana DEQ during the spring and summer of 2011. The spring event was...

    Learn More >

    Jefferson River Temperature Modeling

    A temperature TMDL study was completed for MDEQ on the Upper Jefferson River. The Upper Jefferson River is fed from three headwaters and the study length is approximately 41....

    Learn More >

    Technical Review of RRGL and RDGP Grants

    WET was hired by the Montana Department of Natural Resources and Conservation (DNRC) to provide technical assistance related to its Renewable Resource Grant and Loan (RRGL) and...

    Learn More >

    UST REMOVAL

    Two underground storage tanks (USTs) were removed on the south side of a street in a small Montana town on February 4, 2009. The two 1,000 gallon USTs were discovered while...

    Learn More >

    Coal-fired Generation Facility

    WET Personnel started working at a power plant in 1993 with the permitting of the Industrial Waste Landfill under Subtitle D regulations. The plant is a coal-fired power...

    Learn More >

    Municipal Storm Water Assessment

    The objective of this municipal storm water assessment project was to delineate the storm water infrastructure for a small community in Montana, assess its integrity, and sample...

    Learn More >

    Soil Gas Survey

    WET conducted a soil gas survey at a large above ground storage tank (AST) facility and surrounding neighborhoods in Northern Montana to assess potential vapor intrusion resulting..

    Learn More >

    Clearwater Unit Road Inventory and Mapping Project

    WET was contracted to inventory roads and located in the Blackfoot and Clearwater River Basins of west-central Montana within a spatial accuracy of 40 feet. This involved...

    Learn More >

    Jefferson River Ground Water Study

    This study was performed on behalf of the Jefferson River Watershed Council and Trout Unlimited to define the ground water/surface water interaction in the Waterloo area of the...

    Learn More >

    Reese/Tramway Creek

    Butte-Silver Bow (BSB) developed approximately 57 acres of open space land, near Hillcrest school, owned by BSB into an open space park with a children’s fishing pond. The open...

    Learn More >

    Floodplain Hydraulic and Hydrology Evaluation

    WET was contracted by a regional energy company to provide hydraulic and hydrology evaluation of a Northwestern development in a mapped floodplain. WET used Basin Characteristics...

    Learn More >

    Expert Witness and Remediation

    WET was hired to conduct a field investigation, provide expert witness testimony, and design and implement remedial measures to address historical releases of volatile organic compo

    Learn More >

    Butori Well

    WET was hired by the George Grant Chapter of Trout Unlimited (GGTU) to provide technical oversight and project management of a large scale restoration project in the German Gulch...

    Learn More >

    BSB Hydrodynamic Device (HD) Siting and Installation

    WET provided siting advice, shoring design, and construction oversight services for the installation of five Hydrodynamic Devices in Butte. Tasks included evaluation of proposed...

    Learn More >

    Fertilizer Plant Phase 1 Secondary Containment

    WET has completed design and construction management services of a fertilizer plant secondary containment system. The plant processes phosphate ore to produce fertilizer used...

    Learn More >

    ADLC GIS Management

    Starting in 2006, WET has assisted the Anaconda-Deer Lodge County in setting up an ESRI ArcGIS system to manage all of the County’s spatial data. This proved...

    Learn More >

    Buffalo Gulch Storm Water Tunnel Rehabilitation

    Water and Environmental Technologies served as Engineer for the City/County of Butte-Silver Bow for a rehabilitation project involving a storm water tunnel built in the...

    Learn More >

    Sanitary Sewer Engineering

    WET has provided engineering for a myriad of sanitary sewer characterization, rehabilitation and replacement projects for various municipalities including...

    Learn More >

    Municipal Storm Water Improvements Plan

    WET teamed with another regional firm to complete a Municipal Storm Water Improvements Plan (MSIP) for storm water infrastructure within the Butte Priority Soils Operable Unit...

    Learn More >

    Power Plant Landfill Closure

    WET personnel provided complete design and construction oversight for a monolithic evapo-transpiration (ET) cover for a combustion waste landfill with existing steep slopes (grea...

    Learn More >

    Wind Farm Wetland Permit

    A Montana utility installed a new 4.5 mile 100kV transmission line and 36 power poles between a 100 kV Interconnect Substation and a 25kV Collector Substation...

    Learn More >

    Biological Assessment for Bridge Replacement Project

    Due to the presence of bull trout within a creek associated with a bridge replacement, a Section 7 consultation was required under the Endangered Species Act. A biological...

    Learn More >

    Permitting for State Highway Project

    A Montana utility needed to relocate natural gas and electric distribution lines prior to the Montana Department of Transportation (MDT) highway expansion project.

    Learn More >

    Substation Expansion Project – Dillon Area

    This Montana Substation, located southwest of Dillon, is owned and operated by an Idaho utility company. Land was acquired for an expansion south of the existing platform...

    Learn More >

    Wastewater Treatment Plant Dewatering Project

    The BSB Wastewater Treatment Plant (WWTP) is located within the Butte Priority Soils Operable Unit (BPSOU), which is part of the Silver Bow Creek/Butte Area National Priority List..

    Learn More >

    Substation Expansion Project – Great Falls Area

    A substation expansion project was completed north of Great Falls, Montana. To facilitate utility expansion the footprint of the existing substation pad...

    Learn More >

    Fiber Optic Expansion Project

    A Montana utility company needed to install 409 miles of fiber optic cable to provide faster media service to the rural residents of Hill...

    Learn More >

    Montana Municipal Landfill

    WET was hired to do work for a 130-acre municipal landfill in Montana. Work on the project involved: collection and compaction of municipal solid wastes; soil stockpiling; waste...

    Learn More >

    Canyon River Irrigation System Design and Water Right Change Application

    Water & Environmental Technologies completed a preliminary design of the irrigation system at the Canyon River Development. The upscale development is located around the Canyon...

    Learn More >

    MDT Harrison Avenue Reconstruction

    During the period from March through October 2011, WET provided environmental oversight of the reconstruction of approximately 6000 feet of Harrison Avenue in Butte, Montana...

    Learn More >

    Gasamat of Montana

    WET personnel have investigated and designed remedial actions at 14 UST sites across Montana. Remediation has ranged from complex vapor extraction and air injection to on-site...

    Learn More >

    Gasamat of Colorado

    Because of our successful work on Gasamat sites in Montana, Gasamat Corporation requested that WET work on Sites in Texas, Georgia and Colorado. Because of travel issues, we acce...

    Learn More >

    Transformer Yard Remediation

    Water & Environmental Technologies completed a cleanup of historic PCB contamination originating from historic transformers located at a hydroelectric plant along a Montana river...

    Learn More >

    Domestic Well Sampling Program

    Water & Environmental Technologies developed and implemented a plan to monitor drinking water quality from domestic wells in a rural area within a Superfund site.

    Learn More >

    Industrial Waste Landfill Permitting

    WET Personnel started working at a power plant in 1993 with the permitting of the Industrial Waste Landfill under Subtitle D regulations. The plant is a coal-fired power...

    Learn More >

    Wyoming Power Plant

    WET personnel have provided engineering/environmental consulting services at a four burner, coal-fired power generator since 1992. It is one of the biggest power generation faciliti

    Learn More >

    Utah Power Plant

    WET personnel started working at a coal fired power plant in Utah in 2003 with a facility wide ground water and surface water investigation. A monitoring system was installed...

    Learn More >

    GW/SW Investigation for Coal Fired Power Plant

    Water & Environmental Technologies performed a facility wide ground water and surface water investigation at a coal fired power plant to document and monitor impacts from facility..

    Learn More >

    Kendall Mine Water Rights

    Water & Environmental Technologies was contracted to investigate water rights depletions in the Moccasin Mountain range north of Lewistown Montana.

    Learn More >

    South Meadow Creek Water Efficiency Project

    The South Meadow Creek Water Efficiency project was a project created by the Madison Conservation District (MCD) to evaluate aging and failing irrigation infrastructure on South Mea

    Learn More >

    Small MT Town – Restoration Project

    Water & Environmental Technologies started investigation work in Sunburst in 2002 with a detailed Geoprobe investigation and deeper air rotary drilling to define a gasoline plume...

    Learn More >

    South Meadow Creek Irrigation Assessment

    The South Meadow Creek Water Efficiency project analyzed specific diversion structures and developed alternatives to improve or replace irrigation infrastructure to increase irri...

    Learn More >