Water & Environmental Technologies performed a facility wide ground water and surface water investigation at a coal fired power plant to document and monitor impacts from facility operation. The investigation identified areas where impacts occurred and WET identified and implemented facility operational changes to reduce or eliminate the impacts. These changes involved dewatering of sludge and changes in disposal practices. As a result, new discharge permits were authored to maintain compliance with Utah regulation.