WET provided siting advice, shoring design, and construction oversight services for the installation of five Hydrodynamic Devices in Butte. Tasks included evaluation of proposed HD site locations to determine compatibility with existing BSB utilities/infrastructure, evaluation of environmental and Superfund issues, potential utility conflicts, and connection/integration into the existing stormwater system. WET also prepared Construction Completion Reports (CCRs) for each HD upon completion.