BSB WASTEWATER TREATMENT PLANT DEWATERING
Butte, Montana
After assimilable organic carbon (AOC) mandated nutrient effluent upgrades at the WWTP were halted due to Pentachlorophenol (PCP) in the dewatering effluent, WET was contacted by BSB to provide technical expertise to facilitate the resumption of construction activities. After confirmation that the effluent water had metals and PCP contamination, mitigation strategies were developed to facilitate the needed upgrades at the plant and protect water quality in Silver Bow Creek. Potential mitigation strategies were modeled, and a preferred strategy selected in consultation with agencies and the PRP. A demonstration pilot test of the preferred mitigation alternative was developed and implemented to test the mitigation strategy under the numerous stresses present in the aquifer below the WWTP. This project included coordination between multiple local, state, and federal government entities, multiple meetings, review of a 3-D ground water flow model of the site, additional flow modeling of mitigation strategies and field work including a subsurface Geoprobe investigation, groundwater and surface water sampling and water level monitoring from a pre-test to post-test timeframe.